Building a garage sounds straightforward until you actually look at the ground you're working with. Stumps, ledge rock, overgrown brush, uneven terrain - it all has to go before a single footing gets poured. That's exactly what we were dealing with on this one.
Here's what we were working with: a rough, rocky site with stumps still rooted in, scattered ledge rock sitting at and just below the surface, and ground that was nowhere near level enough to build on. The kind of conditions where skipping steps will haunt you later. So we didn't skip any.
We started with land clearing - getting the stumps and root masses pulled out completely. Leaving stumps behind, even partially, creates voids that settle over time. Not something you want under a garage slab. From there, we worked through the ledge rock cleanup, breaking up and clearing the surface rock so we had clean, workable ground to grade from. Once the debris was cleared and loaded out, we brought in fill and spread it across the entire footprint to get the elevation where it needed to be.
The grading pass at the end is what ties it all together. You can see the finished pad - flat, compacted, and ready for the next trade to come in. That's the goal every time. Give the builder a clean, stable surface with no surprises waiting underneath.
Good site prep doesn't just make the build easier. It protects the structure for the long haul. Settling, cracking, drainage problems - a lot of those issues trace back to corners cut during prep. Getting it right from the start is always worth it.